Case Study Index

Reinvented Aermec WWM Modular Chiller Transforms NYC Multifamily

Reinvented Aermec WWM Modular Chiller Transforms NYC Multifamily

The conventional chiller installed at a high-rise multifamily condominium in New York City had run the course of its useful life
and it was time for a replacement. However, many challenges existed, including tight equipment spaces, limited budgets, a short
timeline and sustainability concerns.

The Bloomberg Center at Cornell Tech Meets LEED & Passive House Standards

The Bloomberg Center at Cornell Tech Meets LEED & Passive House Standards

The Bloomberg Center in New York City embodies Cornell Tech’s commitment to innovation, environmental stewardship and building sustainability. HIGHMARK designed, developed and implemented rainwater harvesting and intelligent stormwater management to increase building efficiency in the Bloomberg Center via water optimization and water filtration. In addition, HIGHMARK installed innovative technologies to…

Cooling Tower Meets Historical Guidelines For Landmark Buildings

Cooling Tower Meets Historical Guidelines For Landmark Buildings

Through plume abatement and exterior dulling, HIGHMARK installed a Mesan cooling tower that met the stringent historical guidelines applied to all landmark buildings in New York City.
A charitable organization expanded its footprint in New York City’s Flatiron District by moving into an 11-story, 125,000-square-foot, historic building erected in 1930.

Enhance Building Energy Management with Complex HVAC Controls & Free Cooling

Enhance Building Energy Management with Complex HVAC Controls & Free Cooling

A global financial firm consolidated its practices into one location in Manahattan, which was considered to be critical infrastructure for trading operations.
To enhance building energy management and building efficiency, the space required complex and redundant equipment and HVAC controls for the chiller plant, which HIGHMARK helped develop and deploy.

Built-on-Site Pool Room Dehumidification System Realizes Major Savings

Built-on-Site Pool Room Dehumidification System Realizes Major Savings

By utilizing the PoolPak® Build-on-Site™ installation program for pool-room dehumidification systems, HIGHMARK saved hundreds of thousands of dollars in avoided construction costs. Working within an extremely tight space, HIGHMARK built on site a PoolPak® pool-room dehumidification system in a high-rise condo in the Upper East Side, New York…

HIGHMARK | Building Efficiency.  All Rights Reserved. Copyright 2019.