Insights: Build-on-Site Pool Room Dehumidification System Realizes Major Savings

By utilizing the PoolPak® Build-on-Site™ installation program for pool-room dehumidification systems, HIGHMARK-NY saved hundreds of thousands of dollars in avoided construction costs.

Working within an extremely tight space, HIGHMARK built on site a PoolPak® pool-room dehumidification system in a high-rise condo in the Upper East Side, New York City – in just three days. Each section was brought in through standard 30″ doors, up a narrow staircase and around existing equipment, and then assembled. No walls were removed, the building’s infrastructure remained fully intact and no rigging was necessary – all without interrupting building operations. By avoiding so many unnecessary construction costs, the result was major savings for HIGHMARK’s customer.

PoolPak® offers a variety of pool-room dehumidification selection options to meet the needs of all indoor pools and natatoriums. For this specific project, the PoolComPak™ series was used, which is a packaged system delivering dehumidification, air and pool-water heating, ventilation and air conditioning in a single unit. The system enhances indoor air quality (IAQ) in the pool room and improves occupant comfort while providing natatorium dehumidification.

In addition, by optimizing energy efficiency via heat recovery and economizers, PoolPak® systems always use the least amount of energy possible, generating energy savings of 40-60% over conventional options. 

 What’s more, PoolPak® systems are user-friendly, dependable and require minimal maintenance since they practically run themselves and are designed specifically for the harsh environment of indoor pools. Therefore, the system installed in this project will deliver consistent customer satisfaction and low upkeep costs over the long-term.

Location: Application: Project type: Technologies: Project size: Year of completion:
High-rise condo building in the Upper East Side, New York City High-rise residential
  • Mechanical, Electrical & Plumbing (MEP)
  • Engineering
  • Pool-room dehumidification
  • Natatorium dehumidification
  • Indoor-pool dehumidification
  • Heat recovery
  • 191-unit, 44-story, high-rise residential building
  • 850 square-foot swimming pool
2015

 

Reinvented Aermec WWM Modular Chiller Transforms NYC Multifamily

Reinvented Aermec WWM Modular Chiller Transforms NYC Multifamily

The conventional chiller installed at a high-rise multifamily condominium in New York City had run the course of its useful life
and it was time for a replacement. However, many challenges existed, including tight equipment spaces, limited budgets, a short
timeline and sustainability concerns.

The Bloomberg Center at Cornell Tech Meets LEED & Passive House Standards

The Bloomberg Center at Cornell Tech Meets LEED & Passive House Standards

The Bloomberg Center in New York City embodies Cornell Tech’s commitment to innovation, environmental stewardship and building sustainability. HIGHMARK designed, developed and implemented rainwater harvesting and intelligent stormwater management to increase building efficiency in the Bloomberg Center via water optimization and water filtration. In addition, HIGHMARK installed innovative technologies to…

Cooling Tower Meets Historical Guidelines For Landmark Buildings

Cooling Tower Meets Historical Guidelines For Landmark Buildings

Through plume abatement and exterior dulling, HIGHMARK installed a Mesan cooling tower that met the stringent historical guidelines applied to all landmark buildings in New York City.
A charitable organization expanded its footprint in New York City’s Flatiron District by moving into an 11-story, 125,000-square-foot, historic building erected in 1930.